Lockhart Stadium Case Study
In 2019, Florida architecture firm Perez & Perez was contacted about an ambitious 18,000-seat stadium for Inter Miami CF with an 11-month timeline from design to completion.
The team considered many materials, but exterior phenolic wall panels rose to the top of the list for their superior durability and versatility.
This project is a stunning structure clad in striking architectural panels that can reliably handle Florida’s persistent wind, heat, and humidity.
As Ruiz sums it up: “Fundermax met everything we were looking for.”
- Project Architect, Jaime Ruiz
Download the full case study to read how Jamie Ruiz utilized Fundermax's phenolic panels for this stadium project in Fort Lauderdale, Florida.